Hollow metal door hinge location chart standard hollow metal door hinge location chart 1 3 4 doors a b c standard weight 134 4 1 2 hinges 623 748 9122 www.
Commercial steel door hinge locations.
When using these charts to locate hinges on doors we subtract the clearance usually 1 8 to get the dimension from the top of the door to the top of each hinge.
Standard hollow metal door hinge location chart 1 3 4 doors a b c standard weight 134 4 1 2 hinges 623 748 9122 www.
1 3 4 doors 4 1 2 hinges hinge location chart.
7 8 2017 9 54 05 pm.
8 0 frames have a 4th hinge.
Field verification of hinge and strike spacings in this situation is necessary.
Hinge locations are for reference only and are subject to change without notice.
Bottom hinge d.
Bottom hinge d not shown in drawing 7 1 2 6 3 4 5 7 1 2 5 1 4.
Standard locations used in the manufacture of steel doors and frames by sdi member companies for the opening sizes shown.
Below is a hinge location sheet showing the hardware locations for various commercial door manufacturers and installation instructions and trouble shooting guide for hollow metal doors and frames.
Measure all hardware locations starting from the top of the door.
C o m measure from the top of the door to the top of each hinge cut out cl measure from the top of.
C o m measure from the top of the door to the top of each hinge cut out cl measure from the top of the door to the center line of the lock cut out cl e note.
Measure to the center line of each hardware cutout at the latching edge of the door.
All commercial metal door hinge measurements should be precisely accurate to 1 16 of an inch.
For 86 lock dimension g is 3 8 greater.
The user must be aware that these spacings shall not be relied upon when retrofitting doors or frames to an exist ing installation.
Hinge location sheet shows several different manufacturers hinge and lock locations from the frame top to the top of each hinge.
Note that the charts are for frame locations with hinges measured top down to the top of each hinge and strikes measured up from the floor aff to centerline.